Cdr dicom system requirements10/20/2023 ![]() An updated Cost Analysis Requirements Description (CARD) based on the system product baseline,.An updated risk assessment for Engineering, Manufacturing, and Development (EMD),.Determine the acceptability of the detailed design, performance, and test characteristics, and on the adequacy of the operation and support documents.Review preliminary hardware product specifications.Assess the results of producibility analyses conducted on system hardware.Assess configuration item risk areas (on a technical, cost, and schedule basis).Establish detail design compatibility among the configuration item and other items of equipment, facilities, computer software, and personnel. ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |